Negotiable
The date of payment from buyers deliver within days
Shandong
Long-term effective
2017-12-22 18:23
198
Company Profile
Tianjin Tanggu Jinbin Valve Co., Ltd.By certification [File Integrity]
Contact:Mr. Jack(Mr.)
Email:
Telephone:
Phone:
Area:Shandong
Address:Shandong
Website: http://hengyu2013.lqfuerda.com/
Factory Size (Sq.meters): | 66,700 square meters |
Number of R&D Staff: | 5 - 10 People |
Number of QC Staff: | Less than 5 People |
Certifications: | ISO14001,ISO9001:2000 |
Contract Manufacturing: | OEM Service Offered Design Service Offered Buyer Label Offered |
• Vulcanized seat design for bubble-tight shutoff at 300 psi. • Flag type position indicator. • Low torque operation, high cycle life. • With built-in supervisory switch. • Top flange to ISO 5211/1. • Flanges designed to EN1092-2 PN10/PN16, ANSI B16.1 Class125 ( Other types available on request).
300PSI. 200PSI and 250PSI available on request.
0.6°C-52 °C |
|
Corrosion Protection |
Part Name |
Material |
EN Spec. |
ASTM Spec. |
|||||
Valve |
Body |
Ductile Iron |
EN-JS1050 |
A536 65-45-12 |
||||
Disc |
Ductile Iron |
EN-JS1050 |
A536 65-45-12 |
|||||
Shaft |
Stainless Steel |
BS970 431S29 |
AISI431 |
|||||
Bushing |
Brass |
CuZn39Pb3 |
B16 C36000 |
|||||
Gear Operator |
Housing |
Cast Iron |
EN-JL1040 |
A126 Class B |
||||
Cover |
Cast Iron |
EN-JL1040 |
A126 Class B |
|||||
Wormgear |
Brass |
CuZn39Pb3 |
B16 C36000 |
|||||
Worm |
Stainless Steel |
BS970 420S37 |
AISI420 |
|||||
Handwheel |
Cast Iron |
EN-JL1040 |
A126 Class B |
Size | A | B | D | E | C | F | G | H | L | M |
DN50 | 110 | 74 | 90 | 43 | 120 | 170 | 65 | 155 | 150 | 200 |
DN65 | 118 | 85 | 90 | 46 | ||||||
DN80 | 130 | 95 | 90 | 46 | ||||||
DN100 | 145 | 115 | 90 | 51.5 | ||||||
DN125 | 160 | 130 | 90 | 56 | ||||||
DN150 | 175 | 145 | 90 | 56.5 | ||||||
DN200 | 200 | 170 | 125 | 60 | 160 | 225 | 85 | 206 | 200 | 300 |
DN250 | 250 | 208 | 125 | 68.5 | ||||||
DN300 | 275 | 237.5 | 125 | 79.5 |
Packing Details:
Each pc into one bubble plastic bag, several pcs into one wooden case; Wooden packing will protect the goods from damage during transportation
Delivery Details:
Within 30 days after order confirmed;
Certificate: